> 사업소개 > 원료처리설비

원료처리설비 Material handing system

세중산전은 플랜트설비의 전기.계장부분에 새로운 가치 창출과 고객의 이익향상을 위해 항상 노력하고 있습니다.

  • No. PROJECT DESIGN
    DRAWING & DOCUMENT
    CLIENT PERIOD
    1 GOSUNG T.P.P UNIT 1&2
    Continuous Ship Unloader
    1. Main Cable Route
    2. Grounding & Lighting System
    3. Lighting System
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    DOOSAN HI&C 2017.10.20∼Ing
    2 HADONG THERMAL POWER PLANT
    Continuous Ship Unloader
    1. Main Cable Route
    2. Grounding & Lighting System
    3. Lighting System
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    DOOSAN HI&C 2017.10∼Ing
    3 Cikarang STRE 1. Main Cable Route
    2. Grounding & Lighting System
    3. Lighting System
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    DOOSAN HI&C 2014.07.∼2016.12
    4 Cikarang GTSU 1. Main Cable Route
    2. Grounding & Lighting System
    3. Lighting System
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    DOOSAN HI&C 2014.07.∼2016.12
    5 Samcheok Power Plant Unit 1&2 CSU 1. Main Cable Route
    2. Grounding & Lighting System
    3. Lighting System
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    DOOSAN HI&C 2013.03.∼
    2013.12
  • No. PROJECT DESIGN
    DRAWING & DOCUMENT
    CLIENT PERIOD
    6 DangJin TPP Unit 9&10 CSU 1. Cable Route
    2. Grounding & Lighting System
    3. Lighting System
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    DOOSAN HI&C 2013.03.∼2013.12.
    7 Kumho Port operations
    CUS 1&2 Project
    1. Cable Raceway System
    2. Grounding & Lighting System
    3. Lighting System(Including AWL System)
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    DOOSAN HI&C 2012.07.∼2013.02
    8 Hyundai steel’s blast furnace
    DangJin 9,10 Unit
    1. Electric Load List
    2. Single Line Diagram
    3. Grounding & Lightning System
    4. Lighting System
    5. Cable Raceway System
    6. Schematic & Block Diagram
    7. Cable Schedule & Cable Connection
    8. Instrument Location Drawing
    HanJin Heavy
    Industries Co.,Ltd.
    2011.09.∼2016.06
    9 NUCLEAR POWER PLANT
    Automatic seismic trip System
    Kori Original 3,4 Unit
    UlJin Original 2~5 Unit
    1. Cable Raceway System
    2. Grounding System
    3. Instrument Location & Conduit DWG
    4. Cable Schedule & Cable Connection
    DOOSAN HI&C 2011.05.∼2012.12
    10 Posco Gwangyang CSU#6 1. Cable Route
    2. Grounding & Lighting System
    3. Lighting System
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    POSCO Plantec 2010.03.∼2010.11
  • No. PROJECT DESIGN
    DRAWING & DOCUMENT
    CLIENT PERIOD
    11 SHIN-KORI NUCLEAR POWER PLANT
    UNIT 3&4
    1. Power cable Sizing
    2. Main Cable Route
    3. Grounding System
    4. Lighting System
    5. Instrument Location & Conduit DWG
    6. Cable Schedule & Cable Connection
    DOOSAN HI&C 2009.11.∼
    2010.08
    12 SHIN-KORI NUCLEAR POWER PLANT
    UNIT 1&2
    1. Power cable Sizing
    2. Main Cable Route
    3. Grounding System
    4. Lighting System
    5. Instrument Location & Conduit DWG
    6. Cable Schedule & Cable Connection
    DOOSAN HI&C 2009.06.∼2010.05.
    13 Posco Gwangyang CSU#4 & #5 1. Cable Route
    2. Grounding & Lighting System
    3. Lighting System
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    DOOSAN HI&C 2009.03.∼2010.01
    14 GECHO Power Plant /
    500MW X 2 TPP
    1. Power cable Sizing
    2. Main Cable Route
    3. Grounding & Lighting System
    4. Lighting System
    5. Instrument Location & Conduit DWG
    6. Cable Schedule & Cable Connection
    DOOSAN HI&C 2009.01.∼2010.10
    15 CEBU Power Plant /
    500MW X 2 TPP
    1. Power cable Sizing
    2. Main Cable Route
    3. Grounding System & Lighting System
    4. Lighting System
    5. Instrument Location & Conduit DWG
    6. Cable Schedule & Cable Connection
    DOOSAN HI&C 2008.10.∼2010.02
  • No. PROJECT DESIGN
    DRAWING & DOCUMENT
    CLIENT PERIOD
    16 PT. Cirebon Electric Power /
    500MW X 2 TPP
    1. Power cable Sizing
    2. Main Cable Route
    3. Grounding System & Lighting System
    4. Lighting System
    5. Instrument Location & Conduit DWG
    6. Cable Schedule & Cable Connection
    DOOSAN HI&C 2008.01.∼
    2010.08
    17 Bo Leong firepower 7,8 Unit
    CSU 2UNITS
    1. Cable Route
    2. Grounding & Lighting System
    3. Lighting System
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    DOOSAN HI&C 2006.03.∼
    2006.11
    18 Hadong TPP Unit 7&8 Power Plant
    500MW X 2 TPP
    1. Power cable Sizing
    2. Main Cable Route
    3. Grounding & Lighting System
    4. Lighting System
    5. Instrument Location & Conduit DWG
    6. Cable Schedule & Cable Connection
    Hanjin Heavy
    Industries CO.,LTD
    2006.01.∼
    2007.11
    19 DangJin TPP Unit 7&8 Power Plant
    500MW X 2 TPP
    1. Power cable Sizing
    2. Main Cable Route
    3. Grounding & Lighting System
    4. Lighting System
    5. Instrument Location & Conduit DWG
    6. Cable Schedule & Cable Connection
    Hanjin Heavy
    Industries CO.,LTD
    2005.12.∼
    2006.10
    20 POSCO Finex stage 2 CSU 1&2 1. Cable Route
    2. Grounding & Lighting System
    3. Lighting System
    4. Instrument Location & Conduit DWG
    5. Cable Schedule & Cable Connection
    DOOSAN HI&C 2005.11.∼
    2006.07
  • 제철설비 Steel Plant

    No. PROJECT DESIGN
    DRAWING & DOCUMENT
    CLIENT PERIOD
    1 Hyundai steel's blast furnace DangJin 1,2 Unit
    COKE Plant & Gas refinery Plant
    1. Cable Schedule & Cable Connection
    2. SWGR, Load center & MCC schematic DWG.
    3. Instrument Material
    4. SWGR, Load center & MCC schematic DWG.
    HanJin Heavy
    Industries Co.,LTD
    2008.04.∼
    2010.02.