고객센터+82-55-600-6273
세중산전은 플랜트설비의 전기.계장부분에 새로운 가치 창출과 고객의 이익향상을 위해 항상 노력하고 있습니다.
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
1 | GOSUNG T.P.P UNIT 1&2 Continuous Ship Unloader |
1. Main Cable Route 2. Grounding & Lighting System 3. Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2017.10.20∼Ing |
2 | HADONG THERMAL POWER PLANT Continuous Ship Unloader |
1. Main Cable Route 2. Grounding & Lighting System 3. Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2017.10∼Ing |
3 | Cikarang STRE |
1. Main Cable Route 2. Grounding & Lighting System 3. Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2014.07.∼2016.12 |
4 | Cikarang GTSU |
1. Main Cable Route 2. Grounding & Lighting System 3. Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2014.07.∼2016.12 |
5 | Samcheok Power Plant Unit 1&2 CSU |
1. Main Cable Route 2. Grounding & Lighting System 3. Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2013.03.∼ 2013.12 |
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
6 | DangJin TPP Unit 9&10 CSU |
1. Cable Route 2. Grounding & Lighting System 3. Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2013.03.∼2013.12. |
7 | Kumho Port operations CUS 1&2 Project |
1. Cable Raceway System 2. Grounding & Lighting System 3. Lighting System(Including AWL System) 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2012.07.∼2013.02 |
8 | Hyundai steel’s blast furnace DangJin 9,10 Unit |
1. Electric Load List 2. Single Line Diagram 3. Grounding & Lightning System 4. Lighting System 5. Cable Raceway System 6. Schematic & Block Diagram 7. Cable Schedule & Cable Connection 8. Instrument Location Drawing |
HanJin Heavy Industries Co.,Ltd. |
2011.09.∼2016.06 |
9 | NUCLEAR POWER PLANT Automatic seismic trip System Kori Original 3,4 Unit UlJin Original 2~5 Unit |
1. Cable Raceway System 2. Grounding System 3. Instrument Location & Conduit DWG 4. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2011.05.∼2012.12 |
10 | Posco Gwangyang CSU#6 |
1. Cable Route 2. Grounding & Lighting System 3. Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
POSCO Plantec | 2010.03.∼2010.11 |
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
11 | SHIN-KORI NUCLEAR POWER PLANT UNIT 3&4 |
1. Power cable Sizing 2. Main Cable Route 3. Grounding System 4. Lighting System 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2009.11.∼ 2010.08 |
12 | SHIN-KORI NUCLEAR POWER PLANT UNIT 1&2 |
1. Power cable Sizing 2. Main Cable Route 3. Grounding System 4. Lighting System 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2009.06.∼2010.05. |
13 | Posco Gwangyang CSU#4 & #5 |
1. Cable Route 2. Grounding & Lighting System 3. Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2009.03.∼2010.01 |
14 | GECHO Power Plant / 500MW X 2 TPP |
1. Power cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2009.01.∼2010.10 |
15 | CEBU Power Plant / 500MW X 2 TPP |
1. Power cable Sizing 2. Main Cable Route 3. Grounding System & Lighting System 4. Lighting System 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2008.10.∼2010.02 |
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
16 | PT. Cirebon Electric Power / 500MW X 2 TPP |
1. Power cable Sizing 2. Main Cable Route 3. Grounding System & Lighting System 4. Lighting System 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2008.01.∼ 2010.08 |
17 | Bo Leong firepower 7,8 Unit CSU 2UNITS |
1. Cable Route 2. Grounding & Lighting System 3. Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2006.03.∼ 2006.11 |
18 | Hadong TPP Unit 7&8 Power Plant 500MW X 2 TPP |
1. Power cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
Hanjin Heavy Industries CO.,LTD |
2006.01.∼ 2007.11 |
19 | DangJin TPP Unit 7&8 Power Plant 500MW X 2 TPP |
1. Power cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
Hanjin Heavy Industries CO.,LTD |
2005.12.∼ 2006.10 |
20 | POSCO Finex stage 2 CSU 1&2 |
1. Cable Route 2. Grounding & Lighting System 3. Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2005.11.∼ 2006.07 |
제철설비 Steel Plant
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
1 | Hyundai steel's blast furnace DangJin 1,2 Unit COKE Plant & Gas refinery Plant |
1. Cable Schedule & Cable Connection 2. SWGR, Load center & MCC schematic DWG. 3. Instrument Material 4. SWGR, Load center & MCC schematic DWG. |
HanJin Heavy Industries Co.,LTD |
2008.04.∼ 2010.02. |