세중산전은 플랜트설비의 전기.계장부분에 새로운 가치 창출과 고객의 이익향상을 위해 항상 노력하고 있습니다.
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
1 | Rabigh Power Plant No.2(RPP2) (MSF Area) Electricity sector Construction drawings design |
1. Instrument Location & Conduit DWG 2. Instrument Hook-up DWG |
DOOSAN HI&C | 2011.06∼ 2014.06 |
2 | Rabigh Power Plant No.2(RPP2) (MSF Area) Electricity sector Construction drawings design |
1. Grounding &Lighting System 2. Lighting System 3. Cable Raceway System 4. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2011.04∼ 2014.06 |
3 | National project Test bed SWRO Electricity, communication Design Services |
1. Grounding &Lighting System 2. Lighting System 3. Cable Raceway System 4. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2010.07∼ 2012.12 |
4 | Shuaibah Independent PJT |
1. Instrument Location & Conduit DWG 2. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2007.09.∼ 2009.11 |
5 | United Arab Emirates FUZAIRAH |
1.Cable Route DWG 2.Grounding DWG |
HanGuk Heavy Industries | 2001.11.∼ 2003.02 |
6 | United Arab Emirates UMM AL-NAR Station B |
1.Cable Route DWG 2.Grounding DWG |
HanGuk Heavy Industries | 2001.03.∼ 2002.04 |
7 | Kuwait SOUTH AZUR |
1.Cable Route DWG 2.Grounding DWG |
HanGuk Heavy Industries | 1999.09.∼ 2001.11 |
8 | United Arab Emirates TAWELLAH A2 |
1.Cable Route DWG 2.Grounding DWG |
HanGuk Heavy Industries | 1999.02.∼ 2001.04 |