No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
1 | SABIYA POWER & DISTILLATION PLANT HRSG |
1. Cable Raceway System 2. Grounding System 3. Single Line Diagram 4. Power Distribution Panel Drawing. |
L&T-Sargent & Lundy Limited BHI CO., LTD. |
2017.10.∼Ing |
2 | AZ-ZOUR SOUTH GAS TURBINES TO CCPP HRSG |
1. Electric Load List 2. Single Line Diagram 3. Power Distribution Panel Drawing. 4. Specification For Electrical Heat Tracing 5. Local Junction Box & Instrument Rack Drawings 6. Cable Specification |
SEPCO Ⅲ Electric Power Construction Corporation BHI CO., LTD. |
2017.07.∼Ing |
3 | FADHILI COMBINED HEAT AND POWER PLANT RESERVER BOILER |
1. Electric Load List 2. Power Distribution Panel Drawing 3. Junction Box Drawing. 4. Grounding & Lightning System 5. Lighting System 6. Container Assembly Drawing 7. Communication System Document & Drawing 8. Gas Detector Drawing |
DOOSN HI&C / HANSOL SEENTEC CO. LTD |
2017.07.∼Ing |
4 | DALAHOO B.O.O COMBINED CYCLE POWER PLANT |
1. Electric Load List 2. Single Line Diagram 3. MCC, PDP & Local Panel detail drawing 4. Specification For Electrical Heat Tracing 5. Grounding & Lightning System 6. Lighting System (Including AWL System) 7. Cable Raceway System 8. Cable Specification 9. Instrument Location Drawing |
FARAB Eneray & Water Projects BHI CO., LTD. |
2017.03.∼Ing |
5 | GRATI CCPP(PEAKER) EXTENSION PROJECT 450MW |
1. Power Distribution Panel Drawing 2. Junction Box & Cabinet Drawing. 3. Grounding & Lightning System 4. Lighting System (Including AWL System) 5. Cable Raceway System 6. Cable Schedule & Cable Connection 7. Instrument Location Drawing |
LOTTE E&C GE Power Systems Korea |
2016.12.∼ 2017.08 |
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
6 | 포항시 생활폐기물 에너지화시설 SRF BOILER |
1. Electric Load List 2. Single Line Diagram 3. Specification For Electrical Heat Tracing 4. Local Box & Instrument Rack Drawings 5. Grounding & Lightning System 6. Lighting System 7. Cable Raceway System 8. Cable Specification 9. Cable Sizing Calculation 10. Cable Principle Diagram 11. Instrument Location Drawing |
POSCO E&C BHI CO., LTD | 2016.12.∼Ing |
7 | ASSIUT & WEST DAMIETTA COMBINED CYCLE ADD ON PROJECT |
1. Single Line Diagram 2. Lighting System 3. Cable Raceway System |
DOOSAN E&C | 2016.03.∼ 2017.05 |
8 | BANGLADESH POWER DEVELOPMENT BOARD GHORSAL 300-450MW CCPP |
1. Single Line Diagram 2. Power Distribution Panel Drawing 3. Junction Box Drawing. 4. Grounding & Lightning System 5. Lighting System (Including AWL System) 6. Cable Raceway System |
DOOSAN E&C | 2015.10.∼ 2016.10 |
9 | Algeria BISKRA & JIJEL CCPP |
1. Single Line Diagram 2. Power Distribution Panel Drawing 3. Junction Box Drawing. 4. Grounding & Lightning System 5. Lighting System (Including AWL System) 6. Cable Raceway System |
HYUNDAI E&C DOOSAN E&C |
2015.03.∼ 2017.06 |
10 | Algeria NAAMA & MOSTAGANEM CCPP |
1. Electric Load List 2. Single Line Diagram 3. Power Distribution Panel Drawing 4. Junction Box & Instrument Rack Drawings 5. Grounding & Lightning System 6. Lighting System (Including AWL System) 7. Cable Raceway System |
SAMSUNG C&T BHI CO., LTD |
2015.12.∼2017.11 |
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
11 | Moka Power Project (MPP) |
1. Electric Load List 2. Single Line Diagram 3. Power Distribution Panel Drawing 4. Junction Box & Instrument Rack Drawings 5. Grounding System 6. Lighting System 7. Cable Raceway System 8. Cable Specification 9. Cable Block Diagrams 10. Cable Schedule & Cable Connection 11. Instrument Location Drawing |
FUJI ELECTRIC BHI CO., LTD |
2015.05.∼Ing |
12 | Karbala Refinery Project |
1. Electric Load List 2. Specification For Electrical Heat Tracing 3. Junction Box Drawings 4. Cable Raceway System 5. Cable Schedule & Cable Connection 6. Instrument Location Drawing 7. Instrument Air Piping & Tubing Layout 8. Hazardous Area Classification Drawing |
SK E&C GS ENTEC Corp. |
2015.05.∼2017.11 |
13 | WIRYE CHP PROJECT |
1. Electric Load List 2. Single Line Diagram 3. Power Distribution Panel Drawing 4. Grounding & Lightning System 5. Lighting System (Including AWL System) 6. Cable Raceway System 7. Cable Specification 8. Container Assembly Drawing |
SIEMENS BHI CO., LTD |
2015.03.∼2017.10 |
14 | ABQ/HGP/RTR Plant Saudi Aramco Third Party Cogeneration Projects |
1. Single Line Diagram 2. Grounding & Lightning System 3. Lighting System 4. Cable Raceway System 5. Cable Schedule & Cable Connection 6. Instrument Location Drawing 7. Hazardous Area Classification Drawing |
SAMSUNG ENGNEERING S & TC |
2014.02.∼2016.06 |
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
15 | RABIGH 2 IPP |
1. Electric Load List 2. Single Line Diagram 3. Power Distribution Panel Drawing 4. Junction Box & Instrument Rack Drawings 5. Grounding & Lightning System 6. Lighting System (Including AWL System) 7. Cable Raceway System 8. Cable Specification 9. Cable Sizing Calculation 10. Cable Block Diagrams 11. Cable Schedule & Cable Connection 12. Instrument Location Drawing |
SAMSUNG C&T BHI CO., LTD |
2014.03.∼2017.08 |
16 | Brazil CSP Power Plant UNIT 1 & 2 Project |
1. Electric Load List 2. Power Distribution Panel Drawing 3. Junction Box & Instrument Rack Drawings 4. Grounding & Lightning System 5. Lighting System (Including AWL System) 6. Cable Raceway System 7. Cable Sizing Calculation 8. Cable Block Diagrams 9. Cable Schedule & Cable Connection 10. Instrument Location Drawing |
POSCO E & C BHI CO., LTD |
2012.10.~ 2015.07 |
17 | Ansan CHPP Project |
1. Single line & PDP Panel 2. Main Cable Route 3. Grounding & Lightning System 4. Lighting System(Including AWL System) 5. Instrument Location & Conduit DWG. 6. Cable Schedule & Cable Connection |
BHI CO.LTD | 2012.09.∼ 2013.08 |
18 | ANDONG COMBINED CYCLE POWER PLANT (416MW X 1) Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection |
BHI CO.LTD | 2012.08.∼ 2013.05 |
19 | DAEGU INNOVATION CITY CHPP(400MW X 1) Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Electric Heat Tracing Layout 7. Cable Schedule & Cable Connection |
BHI CO.LTD | 2012.06.∼ 2013.11 |
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
20 | EMAL PHASE 2 CCPP Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
BHI CO.LTD | 2011.10.∼ 2013.02 |
21 | BUGOK 3 CCPP Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
BHI CO.LTD | 2011.10.∼ 2013.01 |
22 | ARREGLO GENERAL DE LA CENTRAL 28 CCC NORTEⅡ PROJECT |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
BHI CO.LTD | 2011.08.∼ 2012.12 |
23 | INDONESIA INTRGRATED STEEL MILL POWER PLANTUnit 1&2 Project |
1. Electric Load List 2. Power Distribution Panel Drawing 3. Junction Box & Instrument Rack Drawings 4. Grounding & Lightning System 5. Lighting System (Including AWL System) 6. Cable Raceway System 7. Cable Sizing Calculation 8. Cable Block Diagrams 9. Cable Schedule & Cable Connection 10. Instrument Location Drawing |
POSCO E&C / BHI CO.LTD |
2011.08.∼ 2014.02 |
24 | 1200 MW DGEN Mega Power Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection 7. Hook-up DWG |
SIEMENS DOOSAN HI&C |
2010.12.∼ 2012.12 |
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
25 | TOUL |
1. Power Cable Sizing 2. Main Cable Route 3. Lighting System(including AWL System) 4. Instrument Location & Conduit DWG 5. Cable Schedule & Cable Connection 6. Hook-up DWG |
SIEMENS DOOSAN HI&C |
2010.11.∼ 2012.05 |
26 | CHILCA UNO POWER STATION ADD-ON Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
BHI CO.LTD | 2010.11.∼ 2011.10 |
27 | KALLPA 830MW COMBINED CYCLE CONVERSION Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
BHI CO.LTD | 2010.08.∼ 2012.07 |
28 | GENAVEH COMBINED CYCLE POWER PLANT |
1. Electric Load List 2. MCC Single Line Diagram. 3. MCC Typical Detail 4. Cable Raceway System 5. Grounding & Lightning System 6. Lighting System 7. Instrument Location & Conduit DWG. 8. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2010.02.∼ 2010.12 |
29 | 22 COMBINED CYCLE POWER UNITS JAHROM CCPP |
1. Electric Load List 2. MCC Single Line Diagram. 3. MCC Typical Detail 4. Cable Raceway System 5. Grounding & Lightning System 6. Lighting System 7. Instrument Location & Conduit DWG. 8. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2009.10.∼ 2010.12 |
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
30 | GWANGYANG BY PRODUCT GAS CCPP #1 & #2 Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection 7. Hook-up DWG |
BUMWOO ENG., LTD | 2009.02.∼ 2009.12 |
31 | PAJU COMBINED Heat & POWER PLANT Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection 7. DCS IO List |
BUMWOO ENG., LTD | 2008.08.∼ 2009.11 |
32 | RAS LAFFAN C IWPP Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection 7. Control Logic & Loop Diagram 8. Hook-up DWG |
DOOSAN HI&C | 2008.05.∼ 2009.12 |
33 | POWER SERAYA COGEN CCP 30&40 Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection 7. Hook-up DWG |
DOOSAN HI&C | 2007.11.∼ 2008.12 |
34 | MARCHWOOD CCGT, SOUTHAMPTON Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection 7. Hook-up DWG |
DOOSAN HI&C | 2007.05.∼ 2008.07 |
No. | PROJECT | DESIGN DRAWING & DOCUMENT |
CLIENT | PERIOD |
---|---|---|---|---|
35 | STAR BUCK POWER PLANT |
1. Instrument Location DWG. 2. J.B Location & Terminal Assignment Diagram 3. Hook-Up DWG. 4. Control Logic & Loop Diagram |
DOOSAN HI&C | 2007.05∼ 2008.07 |
36 | Al TAWEELAH A10 Power Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection 7. Control Logic & Loop Diagram 8. Hook-up DWG |
DOOSAN HI&C | 2007.05∼ 2008.06 |
37 | TAWEELAH NEW B EXTENSION CCPP Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection 7. Hook-up DWG |
DOOSAN HI&C | 2006.05∼ 2007.07 |
38 | BUGOK 2 CCPP Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection 7. Hook-up DWG |
DOOSAN HI&C | 2006.03∼ 2006.12 |
39 | POSCO FINEX 2 |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |
DOOSAN HI&C | 2005.11∼ 2006.01 |
40 | 1100MW SUGEN CCPP Project |
1. Power Cable Sizing 2. Main Cable Route 3. Grounding & Lighting System 4. Lighting System(including AWL System) 5. Instrument Location & Conduit DWG 6. Cable Schedule & Cable Connection |